Construction photos of the Rosemead Blvd Complete Streets Project as of March 22, 2014. Pictures taken facing and heading north from the Rosemead/Temple City border.
The project's on-street protected bike lane, the San Gabriel Valley's first (and one of the first in southern California), is almost complete. A formal opening celebration has been scheduled for Saturday, May 10th (9 AM - 1 PM), and BikeSGV will be on hand with trailer to distribute information and materials.
For more information about the project, grand opening event details, and more, visit www.rosemeadblvd.com
![](https://cdn.prod.website-files.com/62548695ce5ed64def0afa20/67772c1d7cf235bd77099946_67772bef0ef60734c2b2fd76_Screenshot%25202025-01-02%2520at%25204.12.17%2520PM.png)
![](https://cdn.prod.website-files.com/62548695ce5ed64def0afa20/67772c1d7cf235bd77099949_67772bfb05788496fdc4667a_Screenshot%25202025-01-02%2520at%25204.12.00%2520PM.png)